project: Teresa’s Vineyard
location: West Linn, Oregon
services: site master planning, analysis and design, urban design, stormwater design, renderings, construction and bid document preparation, specifications, cost estimating, and construction administration.
program: Planning studies included the building placements and integration of a high traffic vehicular arrival/ drop off point with a high use pedestrian courtyard for employees. The drop off area needed to accommodate deliveries, visitors and staff with an architectural and way finding language that reflected a new ‘upscale’ sensibility for the company as well as clear visual ques on points of entry. A massive stormwater feature in the adjoining courtyard collected rainwater from the roof and channeled it through an architecturally designed and detailed scupper into a dramatic sculptural receptacle designed around a large infiltration basin. Specialty pavement and furniture design rounded out the outdoor employee open space.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s